Shuttering Construction Worker / Concreter
Clover Ltd
10 Nov 2026
10 Dec 2026
Job Description
Candidate will be responsible for preparing, assembling, installing, and dismantling temporary formwork structures used to hold and shape concrete until it has hardened and gained sufficient strength.
1. Preparation of Shuttering Materials Prepare timber, plywood, steel formwork, and other shuttering materials. Measure, mark, cut, and prepare materials according to construction drawings. Check materials and tools before starting work. 2. Installation and Assembly Install shuttering and formwork for foundations, columns, beams, walls, slabs, stairs, and other concrete structures. Assemble and secure formwork using timber, clamps, bolts, ties, and supports. Ensure correct dimensions, levels, alignment, and positioning. 3. Support and Reinforcement Install props, braces, supports, and other temporary structures. Ensure formwork is sufficiently strong and stable to withstand concrete pressure during pouring. Check that all joints and connections are properly secured to prevent concrete leakage. 4. Concrete Pouring Preparation Ensure shuttering is clean and free from debris before concrete pouring. Apply suitable form-release agents where required. Inspect the formwork before concrete placement. 5. Dismantling and Removal Remove shuttering and formwork after the concrete has sufficiently hardened and when authorised. Carefully dismantle materials without damaging the concrete structure. Clean, sort, and store reusable shuttering materials. 6. Site Safety and Housekeeping Follow all construction site health and safety procedures. Use appropriate personal protective equipment (PPE). Maintain a clean and organised working area. Handle tools, machinery, and materials safely. Report damaged materials, unsafe conditions, or structural concerns to the site supervisor.